Light Rail Transit (Morena Segment)
The Morena Segment of Light Rail Transit (LRT) 416.1 added over 3 miles of new main track through San Diego. This $62 million expansion included traction power lines, three LRT stations (including one elevated), multiple bridge structures, a bus transfer facility, and a park-and-ride lot.
SB&O's role encompassed boundary and topographic surveys, easement staking in environmentally sensitive areas, and construction staking for grading, track alignment, station platforms, retaining walls, bridges, and utility relocations. The firm also helped coordinate with local environmental permits and traffic control measures necessary for building the system through busy urban corridors and wetlands areas.
Project Highlights
- Established horizontal and vertical control for design
- Conducted boundary and topographic surveys
- Provided construction staking for track alignment, bridges, and stations
- Coordinated with utility relocations and environmental compliance
- Assisted with permitting and traffic control planning
More Transportation Projects
Explore other transportation projects from our portfolio.
Ready to Start Your Project?
Let's discuss how our engineering expertise can bring your vision to life.

