La Jolla Crossroads (Sewer)

La Jolla Crossroads Sewer Facilities represent a major infrastructure effort under one of San Diego's largest mixed-use developments. Prior to adding up to 75 feet of fill over the site, the original trunk sewer (72-inch PLRCP) and an 18-inch sewer line had to be rerouted to accommodate new grades.
SB&O handled the feasibility, alignment, and structural design requirements so the new lines could withstand significant overburden. A key design element was a 7'x 7' cast-in-place concrete box 1,500 feet long, installed at the same elevation as the new sewer lines. Through boundary/topographic surveys, final engineering, and construction staking, the firm ensured uninterrupted service while enabling high-density development above.
Project Highlights
- Performed feasibility and capacity analyses
- Designed a deep-fill large-diameter trunk sewer
- Coordinated with residential and commercial site requirements
- Provided construction staking and as-built documentation
- Ensured compliance with local and state utility standards
More Infrastructure Projects
Explore other infrastructure projects from our portfolio.
Ready to Start Your Project?
Let's discuss how our engineering expertise can bring your vision to life.