Skip to content
Industrial San Diego, CA

Allred-Collins Business Park

Allred-Collins Business Park
// Project Overview

Allred-Collins Business Park is a 135-acre planned industrial development featuring wide industrial collector roads, a significant sewer pump station, and extensive off-site roadway widenings. The project lies in Kearny Mesa and required comprehensive planning for grading, drainage, and utilities.

SB&O prepared a tentative subdivision map, cost estimates, feasibility studies, and final designs for major storm drains (72-96 inches in diameter), slope grading, and riparian detention structures. Coordination with CALTRANS involved securing permits for grading near SR-52. Survey tasks included boundary surveys, aerial photogrammetry control, and final monumentation. Construction staking covered mass grading, storm drains, sewer lines, and pump station facilities.

// Key Highlights

Project Highlights

  • Created feasibility studies and cost estimates
  • Prepared tentative subdivision map and final improvement plans
  • Designed major storm drains (72"-96" RCP) and sewer pump station
  • Coordinated with Caltrans for grading within SR-52 ROW
  • Performed boundary/topographic surveys and construction staking

Ready to Start Your Project?

Let's discuss how our engineering expertise can bring your vision to life.