Allred-Collins Business Park

San Diego, CA

Industrial/Business Park

Description

Allred-Collins Business Park is a 135-acre planned industrial development featuring wide industrial collector roads, a significant sewer pump station, and extensive off-site roadway widenings. The project lies in Kearny Mesa and required comprehensive planning for grading, drainage, and utilities. SB&O prepared a tentative subdivision map, cost estimates, feasibility studies, and final designs for major storm drains (72–96 inches in diameter), slope grading, and riparian detention structures. Coordination with CALTRANS involved securing permits for grading near SR-52. Survey tasks included boundary surveys, aerial photogrammetry control, and final monumentation. Construction staking covered mass grading, storm drains, sewer lines, and pump station facilities.

Achievements
Created feasibility studies and cost estimates
Prepared tentative subdivision map and final improvement plans
Designed major storm drains (72\"–96\" RCP) and sewer pump station
Coordinated with Caltrans for grading within SR-52 ROW
Performed boundary/topographic surveys and construction staking

Site Map

Connect

Contact Us

  • San Diego

    (858) 560-1141

  • Temecula

    (951) 695-8900

© 1967-2025 SB&O Inc. All Rights Reserved.